Hellyer Seabird
Project Name: Seabird Dredge Extension
Client: Hellyer Gold Mine
Location: West Coast Tasmania
Overview: Sub41 has delivered 4 different extensions and modifications to the cutter suction dredge at Hellyer Gold since our first call up in 2022. The dredge which mines tailings needs to reach product at different depths throughout mine life. These extension works were during short period shutdowns and required high levels of interface management in a challenging environment. Sub41 is a key partner of Hellyer Gold with most critical and high risk projects falling our way to deliver.